The Board of directors sat and designed the system of administration.Here below is the administration chart:
Before the formulation of the above system,we were employed in diferent firms like Kamu kamu building Construction company(black man's company) in the construction of flat structure building in Jinja town in 1992-93,Pihl-KL Contractor(Denmark)in the project of switchyard and transmission lines from Jinja to Kampala in Uganda 1997-98,Impregil-/Salini.Joint venture(Itanian company) during the construction of Nalubale extension dam 250 megawatts 1998-2000 and Bujagali dam 2007-2010 in Jinja,Spencon Construction Services(Idian company)in the renovation remedial works of the old Nalubale dam 2001-2002 in Jinja,Excel Construction (Indian Company) in the construction of eastern water tanks i,e Kayunga,Kamuli,Buwenge and Palisa under a Cowi consultancy firm in 2002-2003,Dott Service LTD(Indian company) in the contruction of Wambabya dam 3x3 megawatts in Hoima district;currently the dam is powering the fields of Oil extraction in Kaiso and Tonya sources,KCC Jinja road construction project under Kaaga and partner consultancy firm special for supervision and designs in 2010-2013,construction of kawempe Luwero tarmac road contructed by Uricon situated at Kololo in 2008-2010..
Currently we are employees of Amugoli General Enterprises LTD(black man's company) in the construction of Hoima central market under a consultancy firm MBWS 2010-2013 and construction of Uganda Technical College(UTC) in Buwalasi Mbale district 2013-2015 under the consultancy of Archi-forum.
For more information:
Please contact us on
+256774982686 / +256750773509-David Sewranga [Managing Director]
davidserwanga@gmail.com
caoman082@gmail.com
+256772864402 / +256703548607-Ntambi Herman [Gen.Manager]
herntambi@yahoo.com
+256777221186 / +256794221186-Anguyo Moses [Construction manager]
moscivo@yahoo,com
+256772659086 / +256755659086 / +256702659086-Okany Henry Jacob [Project manager]+256777221186 / +256794221186-Anguyo Moses [Construction manager]
moscivo@yahoo,com
okanyhj@yahoo.com
+256704669673 / +256755317930-Kaabi William [Project engineer]
+256702247865-Mbirontono Aramathan [Asst.Procurement]
+256753390480-Were Wilson [General foreman]
+256755367012-Abubakar Wakisoro [Foreman]
We are pleased to present to you in brief a dossier of the above Sentwe Civil Engineering Service LTD.Being a small scale enterprise,our overale abjective is to erngauge in commercial or business activities with a view of making profits for the services of goods rendered or supplied to our clients.
As a company we have a vision,a mission,objectives,aims and targets that drive our operations.
Mission
1,Works with civil engineers to design brigdes,highways,dams,buildings and airports
2.Works with engineers to layout,prepare speciefications of work survey or drafting items
3.Worl out on construction sites or in offices of architects and construction company.
Vision
We happened to look at the opportunities in Uganda aand since we are urged over to be creative in order to cope up with the fast running world,we sat down as young engineers and technicians thought of what to do,forming a company was the first idea among othewrs.
As mention above ealier this is the reason we came up to introduce ourselves to you with a summary of the objectives,aims and targets.
Objectives
A.Organise skills personnel to improve their expertise as a group who havebeeen working together with a common interest i.e dam contruction.
B.To give employment opportunities
C.To keep in touch with growing expertise in construction.
D.To keep a work force of skilled or semi skilled personnelas of which some are experienced and some are professionals and others experienced in other fields.
Aims
1.Learn more skillls and technology
2.Advanced in skills
3.Skilled personnel staying in touch
4.Assist semi skilled personnel to get a job as an employee since they can learn on job.
Targets
A company with skilled personnel is more advantaged due to more technology more skills.
All construction solutions
- Road constructions
- Road painting
- Building construction
- Bridge construction
- Water projects
- Computer works
- Civil works
Below is our company profile.
COMPANY PROFILE
Company name
Sentwe Civil Engineering Services LTD
Postal address
P.O BOX 1625 Kampala
Physical address
Masajja,Busabala road off Entebbe main Road
Date of commencement
2013 April 15
CABINATE TECHNICAL AND CONTRACT PERSONNEL
Eng.Herman Ntambi Hons ODC incivil engineering & building construction.(KU)Tech. Serwanga David Award advanced certificate in building and construction.(BTI)
Eng.Anguyo Moses Hon HDC & ODC in civil engineering & building construction.KU)
Tech Were Wilson Award advanced certificate in building & construction (BTI)
Eng Kaabi William Hon ODC & BSc civil engineering(MU) &(UTC Elgon)
Eng.Okany Henry Jacob Hon BSc,HD,CPM & ODC in civil engineering(UTC,KU,MU &UMI)
Tech Abubakali Wakisoro Award craft part1 in building and construction(UTCI)
Below is a list of directors of Sentwe Civil Engineering Services Ltd
Serwanga DavidNtambi Herman
Anguyo Moses
Were Wilson
Abubakali Wakisoro
Okany Henry Jacob
Kaabi William
Below is a list of staff for the company
Martha Adong Hon ODC in accountancy(BU Iganga) Tororo districtKituyi Elizabeth Award certificate in stenography(YMCA Jinja) Mbale district
Tebikoma Alfred Hon UDBS in busines studiess & store management(Nakawa)Kayunga d
Yabinze Geofrey Award cdertificate in electricity(NVI Nakawa )Iganga district
Kityo Philip Hon ODC in civil engineering & building (UTC Elgon) Lira district
Musirya Peter Hon ODC in civil engineering & building (UTC Elgon) Palisa district
Wabwire Mathias Semi skilled mason Busia district
Kigongo Sulaiman Semi skilled mason Buikwe district
Mbazira Fred Semi skilled mason Jinja district
Asuman Magumba Semi skilled mason Buikwe district
Munyifha Sam Semi skilled mason Mbale district
Mukula Deo Semi skilled carpenter Mayuge district
WAmbuza Saidi Semi skilled in carpenter and joinery Jinja district
Kalema John Semi skilled mason Wakiso district
Businge John Semi skilled mason Hoima district
Samanya Iddi Semi skilled mason Buikwe district
Bogere Sulaiman Semi skilled mason Jinja district
Banabasi Henry Semi skilled mason Kabale district
CURRICULUM VITAE
|
POSITION
|
SUPERVISOR/SITE ENGINEER/
SITE MANAGER
|
|
|
Candidate information
|
Name of candidate:
Mr. Serwanga David
Mobile: 0774-982685
0750-773509
Email: davidserwanga@gmail.com.
|
Date of birth:
Dec 12th 1968
Bukamba Nazigo
Kayunga District
|
|
Professional qualification:
|
Civil technician
|
|
|
Present employment
|
Name of employer:
|
Amugoli General Enterprises Ltd.
P. O. Box 70214 Kampala (U)
|
|
Address of employer:
|
Royal city resort hotel opposite
Bugolobi shell.
|
|
|
Job title of candidate:
|
Years of experience:
|
|
|
Site manager to technical
preparation department (site works).
|
23
|
|
|
EDUCATION BACKGROUND
|
||
|
YEAR
|
INSTITUTION
|
AWARD
|
|
1983 – 1984
|
Bugaddu Primary School
|
Primary
Leaving Examinations (PLE)
|
|
1985 – 1988
|
St. John Bosco
P. O. Box 73, Kamuli District
|
Uganda
Certificate Of Education (UCE)
|
|
1990 – 1992
|
Butaleja Technical Institute
P. O. Box 930, Tororo
|
Craft
Certificate Part I
|
|
1993 - 1994
|
Butaleja Technical Institute
|
Advanced Certificate Part II
Respectively
|
|
1995-1997
|
Uganda Polytechnic Kyambogo
|
Ordinary Diploma in Civil
Engineering and Building Construction.
|
|
WORKING
EXPERIENCE
|
||
|
Summarized professional experience
over the last sixteen years in reverse chronological order that indicate
particular technical and managerial experience relevant to the project.
|
||
|
From
|
To
|
Company/ project /position and relevant technical and
management experience.
|
|
2013
|
2016
|
Contractor: Amugoli General Enterprises Limited
Position: Site Manager
Project: Extension and rehabilitation of Uganda Technical College
(UTC) Elgon Mbale.
Duties:
i. Taking levels with dumpy level to determine the filling and cuts of marrum. ii. Setting out and checking the excavation of both ads and strip foundation are in good alignment. iii. Supervising the placement of steel works, formworks and insitu concreting of the structure. iv. Measurement of quality of work as out done per day. v. Supervision of subcontractors. vi. Selection of suitable marrum soil materials for back filling. vii. Preparation of the bills of quantities of quantities for and as per the specification of civil engineering works concerned. viii. Soil and cubes testing. |
|
2010
|
2013
|
Contractor: Amugoli General
Enterprises Limited
Position: General Foreman
Project: Reconstruction of Hoima Central Market
(consists of six blocks each
with 40 x 12.3M dimensions).
Duties:
i. Taking levels with dumpy level to determine the filling and cuts of marram. ii. Setting out and check the excavation of both ads and strip foundation are in good aligned. iii. Supervising the placement of steel works, formworks and insitu concreting of the structure. iv. Measurement of quality of work as out done per day. v. Supervision of subcontractors. vi. Selection of suitable marram soil materials for back filling. vii. Preparation of the bills of quantities of quantities for and as per the specification of civil engineering works concerned. |
2010
|
2010
|
Contractor: Mugweri Enterprises
P. O. BOX # Jinja
Position: Site Engineer.
Project: Design and supervision of a four store yard building
Plot 120 Iganga town.
Duties:
i. Advise the client on the suitable construction methods and materials to be checked and controlled. ii. Interpret for the contractor the structural drawings and plans iii. Prepare bills of quantities for the contractor. iv. Ensuring quality control on the contraction works including safety measures. v. Advice the clients on the appropriate adjustments to suit both the designs and site conditions to be altered or changed carry out other duties as forwarded and requested by the contractor. vi. Supervision of marrum road construction and proper cut along the road. |
|
2009
|
2009
|
Contractor: Sherey International (U) Ltd.
Position: Site Engineer.
Duties:
i.
Renovation
and completion of a one storied structures floor at lot 14 grant road Jinja Municipality.
|
|
2008
|
2008
|
Dott Service:
Project:
Construction of a 3 X 3 Mega Watts
project dam on River
Wambabya fall.
It was done purposely
to extract fuel from Kaiso and Tonya (and nearby towns like Buseruka,
Kigolobya, Mbaraara) to Hoima and Masindi district.
|
|
2007
|
2008
|
Contractor: Salini Construction Bujagali HPP
Position: Foreman, Carpenter and Concrete in-Charge.
Project: Construction of New Dam of 500 Mega Watts
Duties:
i. Organizing and preparation of concrete cast ii. Cleaning and chipping casted concrete in order to bond the next. iii. Supervision of carpentry section to apply on formworks. iv. Striking off formworks. v. Preparation of daily attendance. vi. Preparation of far grout fills and finishes. vii. Application of Sika on floors, Insitu cast and finishes immediately. |
|
2004
|
2006
|
Contractor: Sherey International (U) Ltd.
Position: Site Engineer.
Project:
i. Building residential and lodge at Nalufenya behind Police Station, near the Source of the River Nile (A three storied floor structure). ii. Construction of a one floor Commercial Building for Professor David Bakibinga at Bugembe Town Council, where Centenary Bank and water office is situated. |
|
2003
|
2003
|
Contractor: Multiple Development Scheme Project – Busoga
Diocese.
Position: Site Supervisor / Engineer.
Project: Water in Rural Development Sector Services all over the
Country (Uganda).
|
|
2002
|
2003
|
Dott Services Ltd.
Project: Kibingo PTC College Mbarara (being controlled by the
Principal Rwamafa Javin).
Duties:
i. Construction of a Boy’s hostel block, 3 classroom block, and Principal’s house as a sub contract – labour basis. ii. Worked at Nakasongola district from Barracks to town. Mainly concentrated on a five stand post station for supplying water. |
|
2001
|
2001
|
Excel Construction Company Limited.
Position: Site Supervisor under my controller Engineer Wuni.
Duties:
Worked with Excel Construction
Company Limited on Eastern Water Project under the consultant firm called
COWL. The project started on 6th May 2001 to 27th July
2001. The site stipulated:
i. Kayunga Water Tank (1.5 X 1.5 X 1.5) m base stand including fencing and gate. ii. Ndeeba - Bukoloto Water Tank (1.5 X 1.5 X 1.5) m base stand including fencing and gate. iii. Kamuli Water Tank (1.75 X 1.75 X 1.75) m base stand and two water source stations with fence and gates. iv. Palisa Water Tank (1.75 X 1.75 X 1.75) m base stand and gate were installed at the hospital compound area. v. Finalized with Buwenge Water Tank being erected on draft reinforced wall as its stand at Buwera hill village suburb of Buwenge Town. Two water sources stations were made by putting fencing and gates to its surroundings. |
|
2000
|
2001
|
Spencon Services Limited
Position: Supervisor on Remedial Works on Old Nalubale Dam
Duties:
i. Supporting with reinforced semi dry concrete down at the falls gate terrace and removing out old pavers to replace with the new, for the walk way sides along the crossing bridge. ii. All the works was controlled by the Project Manager called Eng. Bimma (Spencon Company). |
|
1997
|
2000
|
Contractor: Imprigilo / Salini joint venture.
Position: Supervisor / Foreman
Project: Construction Of Extension Power Dam (Nalubale) 250 Mega Watts
Duties:
i. Supervised quality of cement to be put in and monitored quality on site. And this included quality control concrete, proper placement of embedded parts formwork and steel. ii. Supervised the placing of concrete (Insitu cast) in a clean supervised area. iii. Grouting: Curtin grouting of classified material to bonding the embankments abutments i.e. to prevent penetration of water passage between rocks and concrete and also concrete layer and consolidated grouting to seal off the possible cracks. iv. Supervision of good concrete bathing (with a good work, able to ensure specified quality of concrete and checking qualities of proper water : cement ratio together with cement aggregates ratio and additives i.e. (Sika), together with ice proper proportioning of materials in a mixer plant. v. Taking care of clean materials to be used i.e. good water fit for drinking, washing and sand to remove out silt and bad soil in it as well as ensuring that aggregate is at a dense weight according to the type of work carried forward. vi. In the matter of the contractors on site testing reviewing of the test procedures. |
|
1996
|
1997
|
Contractor: Pihil – KL Contractors
Position: Foreman
Project: Construction of Switch Yard Extension at Own Falls Dam (UEB)
Jinja and tower lines to Mutundwe Substation
Kampala.
|
|
1993
|
1994
|
Contractor: Kamu Kamu Building
Construction Co.
P. O. BOX 223 Jinja
Position: Assistant Foreman.
Project: Construction of Three Storied Structures (Both Kato
Building on Iganga Rd. and Biashara Supermarket Main Street – Opposite the
Central Police Station - Jinja.
|
HOBBIES
Travelling,
Football, Cycling, Drawing and Driving
LANGUAGES
Fluent
in Luganda, English and very little in Swahili.
REFEREES
Eng. Eyatu Oriano Joseph (Managing Director)
Amugoli General Enterprises Ltd
P. O. Box 70214 Kampala, Uganda.
Tel: 0772-591919 / 0755-919000
Eng.
Maheshi and Parasat (All Directors of Dott Services Ltd)
P.O.Box # Nagulu Office Kampala, Uganda.
Tel. 0701-772701
Rt.
Eng. Babinga Joseph (My supervisor at Sherey Rasham Singh -
Nalufenya site and Iganga Plot 120 site)
Tel: 0772-629115
Prof.
David Bakibinga (Deputy Vice Chancellor Makerere
University)
P. O. Box 7062 Kampala, Uganda.
Tel: 0772 402356
Mr.
Elided Malume
Principal Butaleja Technical Institute.
P. O. Box 930 Tororo, Uganda.
Tel: 0772-460982
Mr.
Mutezindwa Joseph (Head of School)
Uganda Polytechnic Kyambogo
P. O. Box 7181 Kampala, Uganda.

Hoima market and Nalubale dam
Hoima central market









































































this is very good
ReplyDelete